Drop in every proposal. Get one levelled sheet.
Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or paste from Excel, or start from a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.
Type a number, i for included, x for excluded, or leave a cell empty for not mentioned. Arrow keys, Tab and Enter move between cells. Paste a block copied from Excel to fill a range. Ctrl or Cmd plus Z undoes the last change.
| Scope line | Your estimate | ||||
|---|---|---|---|---|---|
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| Base bid as written | |||||
| Sales tax included | |||||
| Bond included | |||||
| Notes and qualifications | |||||
| Sum of priced lines | — | — | — | ||
| Plugs for gaps | +011 unpriced | +011 unpriced | +011 unpriced | ||
| Levelled total | —no number yet | —no number yet | —no number yet | ||
| Alternates — compared side by side, never in totals | |||||
Type a number, i for included, x for excluded, or leave it empty for — not mentioned. Arrows, Tab and Enter move like a spreadsheet. Paste a block from Excel into any cell to fill the range.
Levelled result
- Lowest levelled
- —
- No complete bid yet
- Spread
- —
- Lowest to highest, levelled
- Gaps priced in the low bid
- $0
- Would surface later as change orders
- High-priority flags
- 17
- 23 flags in all
Ranked, like for like
Solid is what they quoted. Striped is what their gaps cost at your plug method.
- Bidder A — no base bid and no priced lines yet.
- Bidder B — no base bid and no priced lines yet.
- Bidder C — no base bid and no priced lines yet.
What to check before award
Alternates, side by side
Not counted in any total.
| Alternate | Bidder A | Bidder B | Bidder C |
|---|---|---|---|
| Upgrade to abuse-resistant board | — | — | — |
Method: each bid starts from its stated base bid, or the sum of its priced lines when no base bid is given. Every base line a bidder excluded or did not mention gets a plug: your estimate for that line when you have entered one, otherwise the median or highest price from the bidders who priced it, per the plug method. Stated plus plugs is the levelled total, and bids are ranked on it. Alternates are compared side by side and never counted in totals. A line under half or over twice the median is flagged once at least three bidders have priced it. Everything is worked out in your browser.
3 of 3 bidders have questions to answer.
Bidder A
14 questionsSubject: Scope clarification: Drywall and framing — Drywall and framing package
Hi Bidder A, Thank you for your bid on Drywall and framing — Drywall and framing package. We are levelling all bids to the same scope and need to confirm a few items: 1. Is “Metal stud framing” included in your base bid? If not, please price it. 2. Is “Hang and tape” included in your base bid? If not, please price it. 3. Is “Level 5 finish where scheduled” included in your base bid? If not, please price it. 4. Is “Acoustical ceilings” included in your base bid? If not, please price it. 5. Is “Batt insulation in walls” included in your base bid? If not, please price it. 6. Is “Backing and blocking” included in your base bid? If not, please price it. 7. Is “Shaft wall” included in your base bid? If not, please price it. 8. Is “Fire-rated assemblies” included in your base bid? If not, please price it. 9. Is “Access panels, install” included in your base bid? If not, please price it. 10. Is “Patch after MEP trades” included in your base bid? If not, please price it. 11. Is “Clean-up and debris removal” included in your base bid? If not, please price it. 12. Does your price include sales tax? 13. Does your price include a performance and payment bond, and if not, what is the bond rate? 14. Please provide a price for alternate “Upgrade to abuse-resistant board”, or confirm you are not offering it. Could you reply at your earliest convenience? Your answers help us compare every bid fairly. Thanks,
Bidder B
14 questionsSubject: Scope clarification: Drywall and framing — Drywall and framing package
Hi Bidder B, Thank you for your bid on Drywall and framing — Drywall and framing package. We are levelling all bids to the same scope and need to confirm a few items: 1. Is “Metal stud framing” included in your base bid? If not, please price it. 2. Is “Hang and tape” included in your base bid? If not, please price it. 3. Is “Level 5 finish where scheduled” included in your base bid? If not, please price it. 4. Is “Acoustical ceilings” included in your base bid? If not, please price it. 5. Is “Batt insulation in walls” included in your base bid? If not, please price it. 6. Is “Backing and blocking” included in your base bid? If not, please price it. 7. Is “Shaft wall” included in your base bid? If not, please price it. 8. Is “Fire-rated assemblies” included in your base bid? If not, please price it. 9. Is “Access panels, install” included in your base bid? If not, please price it. 10. Is “Patch after MEP trades” included in your base bid? If not, please price it. 11. Is “Clean-up and debris removal” included in your base bid? If not, please price it. 12. Does your price include sales tax? 13. Does your price include a performance and payment bond, and if not, what is the bond rate? 14. Please provide a price for alternate “Upgrade to abuse-resistant board”, or confirm you are not offering it. Could you reply at your earliest convenience? Your answers help us compare every bid fairly. Thanks,
Bidder C
14 questionsSubject: Scope clarification: Drywall and framing — Drywall and framing package
Hi Bidder C, Thank you for your bid on Drywall and framing — Drywall and framing package. We are levelling all bids to the same scope and need to confirm a few items: 1. Is “Metal stud framing” included in your base bid? If not, please price it. 2. Is “Hang and tape” included in your base bid? If not, please price it. 3. Is “Level 5 finish where scheduled” included in your base bid? If not, please price it. 4. Is “Acoustical ceilings” included in your base bid? If not, please price it. 5. Is “Batt insulation in walls” included in your base bid? If not, please price it. 6. Is “Backing and blocking” included in your base bid? If not, please price it. 7. Is “Shaft wall” included in your base bid? If not, please price it. 8. Is “Fire-rated assemblies” included in your base bid? If not, please price it. 9. Is “Access panels, install” included in your base bid? If not, please price it. 10. Is “Patch after MEP trades” included in your base bid? If not, please price it. 11. Is “Clean-up and debris removal” included in your base bid? If not, please price it. 12. Does your price include sales tax? 13. Does your price include a performance and payment bond, and if not, what is the bond rate? 14. Please provide a price for alternate “Upgrade to abuse-resistant board”, or confirm you are not offering it. Could you reply at your earliest convenience? Your answers help us compare every bid fairly. Thanks,
Enter at least one base bid or priced line to export a levelled comparison.
Also free: scope checklists for 16 trades · the fifteen-question pre-award check
Drop in every proposal. Get one levelled sheet.
Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or paste from Excel, or start from a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.
Open the Bid LevelerThe levelling runs in your browser. GeneralBid only sees a proposal you choose to have read, and does not store it, or a sheet you choose to save as a share link.