Drop in every proposal. Get one levelled sheet.
Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or paste from Excel, or start from a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.
Type a number, i for included, x for excluded, or leave a cell empty for not mentioned. Arrow keys, Tab and Enter move between cells. Paste a block copied from Excel to fill a range. Ctrl or Cmd plus Z undoes the last change.
| Scope line | Your estimate | ||||
|---|---|---|---|---|---|
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| no plug | no plug | no plug | |||
| Base bid as written | |||||
| Sales tax included | |||||
| Bond included | |||||
| Notes and qualifications | |||||
| Sum of priced lines | — | — | — | ||
| Plugs for gaps | +09 unpriced | +09 unpriced | +09 unpriced | ||
| Levelled total | —no number yet | —no number yet | —no number yet | ||
| Alternates — compared side by side, never in totals | |||||
Type a number, i for included, x for excluded, or leave it empty for — not mentioned. Arrows, Tab and Enter move like a spreadsheet. Paste a block from Excel into any cell to fill the range.
Levelled result
- Lowest levelled
- —
- No complete bid yet
- Spread
- —
- Lowest to highest, levelled
- Gaps priced in the low bid
- $0
- Would surface later as change orders
- High-priority flags
- 15
- 21 flags in all
Ranked, like for like
Solid is what they quoted. Striped is what their gaps cost at your plug method.
- Bidder A — no base bid and no priced lines yet.
- Bidder B — no base bid and no priced lines yet.
- Bidder C — no base bid and no priced lines yet.
What to check before award
Method: each bid starts from its stated base bid, or the sum of its priced lines when no base bid is given. Every base line a bidder excluded or did not mention gets a plug: your estimate for that line when you have entered one, otherwise the median or highest price from the bidders who priced it, per the plug method. Stated plus plugs is the levelled total, and bids are ranked on it. Alternates are compared side by side and never counted in totals. A line under half or over twice the median is flagged once at least three bidders have priced it. Everything is worked out in your browser.
3 of 3 bidders have questions to answer.
Bidder A
11 questionsSubject: Scope clarification: Fire protection — Fire protection package
Hi Bidder A, Thank you for your bid on Fire protection — Fire protection package. We are levelling all bids to the same scope and need to confirm a few items: 1. Is “Sprinkler mains and branch lines” included in your base bid? If not, please price it. 2. Is “Heads and trim” included in your base bid? If not, please price it. 3. Is “Design and hydraulic calcs” included in your base bid? If not, please price it. 4. Is “Permits and fees” included in your base bid? If not, please price it. 5. Is “Standpipes” included in your base bid? If not, please price it. 6. Is “Fire pump” included in your base bid? If not, please price it. 7. Is “Backflow preventer” included in your base bid? If not, please price it. 8. Is “Fire department connection” included in your base bid? If not, please price it. 9. Is “Testing and certification” included in your base bid? If not, please price it. 10. Does your price include sales tax? 11. Does your price include a performance and payment bond, and if not, what is the bond rate? Could you reply at your earliest convenience? Your answers help us compare every bid fairly. Thanks,
Bidder B
11 questionsSubject: Scope clarification: Fire protection — Fire protection package
Hi Bidder B, Thank you for your bid on Fire protection — Fire protection package. We are levelling all bids to the same scope and need to confirm a few items: 1. Is “Sprinkler mains and branch lines” included in your base bid? If not, please price it. 2. Is “Heads and trim” included in your base bid? If not, please price it. 3. Is “Design and hydraulic calcs” included in your base bid? If not, please price it. 4. Is “Permits and fees” included in your base bid? If not, please price it. 5. Is “Standpipes” included in your base bid? If not, please price it. 6. Is “Fire pump” included in your base bid? If not, please price it. 7. Is “Backflow preventer” included in your base bid? If not, please price it. 8. Is “Fire department connection” included in your base bid? If not, please price it. 9. Is “Testing and certification” included in your base bid? If not, please price it. 10. Does your price include sales tax? 11. Does your price include a performance and payment bond, and if not, what is the bond rate? Could you reply at your earliest convenience? Your answers help us compare every bid fairly. Thanks,
Bidder C
11 questionsSubject: Scope clarification: Fire protection — Fire protection package
Hi Bidder C, Thank you for your bid on Fire protection — Fire protection package. We are levelling all bids to the same scope and need to confirm a few items: 1. Is “Sprinkler mains and branch lines” included in your base bid? If not, please price it. 2. Is “Heads and trim” included in your base bid? If not, please price it. 3. Is “Design and hydraulic calcs” included in your base bid? If not, please price it. 4. Is “Permits and fees” included in your base bid? If not, please price it. 5. Is “Standpipes” included in your base bid? If not, please price it. 6. Is “Fire pump” included in your base bid? If not, please price it. 7. Is “Backflow preventer” included in your base bid? If not, please price it. 8. Is “Fire department connection” included in your base bid? If not, please price it. 9. Is “Testing and certification” included in your base bid? If not, please price it. 10. Does your price include sales tax? 11. Does your price include a performance and payment bond, and if not, what is the bond rate? Could you reply at your earliest convenience? Your answers help us compare every bid fairly. Thanks,
Enter at least one base bid or priced line to export a levelled comparison.
Also free: scope checklists for 16 trades · the fifteen-question pre-award check
Drop in every proposal. Get one levelled sheet.
Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or paste from Excel, or start from a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.
Open the Bid LevelerThe levelling runs in your browser. GeneralBid only sees a proposal you choose to have read, and does not store it, or a sheet you choose to save as a share link.