CSI MasterFormat 09 60 00
Levelling flooring bids in New York, NY
Buying flooring for a project in New York? Whatever the city, the bids that look cheapest are usually the ones that leave something out. Floor preparation and moisture mitigation are the change orders waiting to happen.
The scope lines
Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.
- 1Carpet tile
- 2Luxury vinyl tile
- 3Ceramic and porcelain tile
- 4Rubber base
- 5Floor preparation and levelling
- 6Moisture testing
- 7Moisture mitigation
- 8Transitions and trims
- 9Attic stock
Usual alternates
- Sealed concrete
Where flooring bids differ
- Floor preparation and levelling excluded, or limited to minor patching.
- Moisture testing included but moisture mitigation excluded, which is where the cost is.
- Transitions, trims and rubber base split between flooring and other finishes.
- Attic stock quantities missing or different between bids.