CSI MasterFormat 23 00 00

Levelling hvac bids in Miami, FL

Buying hvac for a project in Miami? Whatever the city, the bids that look cheapest are usually the ones that leave something out. Controls, test and balance, and structural supports are the recurring exclusions.

The scope lines

Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.

  1. 1Rooftop units and equipment
  2. 2Ductwork
  3. 3Grilles, registers and diffusers
  4. 4Hydronic piping
  5. 5Controls and BAS
  6. 6Test and balance
  7. 7Duct insulation
  8. 8Equipment supports and curbs
  9. 9Crane and rigging
  10. 10Startup and commissioning support
  11. 11Permits and fees

Usual alternates

  • Extended warranty

Where hvac bids differ

  • Controls and BAS excluded from the mechanical bid and bid separately by a controls vendor.
  • Test and balance excluded, or assumed to be carried by the owner.
  • Equipment supports, curbs and structural framing for rooftop units left to steel or roofing.
  • Crane and rigging for rooftop equipment assumed to be the GC's.

Have the spec section?

The Bid Leveler can draft your scope lines from the project’s own spec, each with the paragraph it came from, so you level against what this job actually requires.

Open the Bid Leveler →

Drop in every proposal. Get one levelled sheet.

Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or start from your spec section, paste from Excel, or pick a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.

Open the Bid Leveler

The levelling runs in your browser. GeneralBid only sees a proposal or spec you choose to have read, and does not store it, or a sheet you choose to save as a share link.