Skip to content

CSI MasterFormat 04 00 00

Levelling masonry bids in Austin, TX

Buying masonry for a project in Austin? Whatever the city, the bids that look cheapest are usually the ones that leave something out. Grout, reinforcing and flashing are frequently split between masonry and other trades.

The scope lines

Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.

  1. 1CMU walls
  2. 2Brick veneer
  3. 3Grout and reinforcing
  4. 4Through-wall flashing and weeps
  5. 5Lintels, set only
  6. 6Control joints and sealant
  7. 7Scaffolding
  8. 8Mortar and cleaning
  9. 9Cold weather protection

Usual alternates

  • Stone accents

Where masonry bids differ

  • Grout and reinforcing in CMU carried by neither the mason nor the concrete sub.
  • Through-wall flashing and weeps assumed to be by the waterproofing or roofing sub.
  • Scaffolding excluded, or priced for one lift less than the elevations need.
  • Lintels set but not furnished, with the steel left to miscellaneous metals.

Have the spec section?

The Bid Leveler can draft your scope lines from the project’s own spec, each with the paragraph it came from, so you level against what this job actually requires.

Open the Bid Leveler →

Drop in every proposal. Get one levelled sheet.

Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or start from your spec section, paste from Excel, or pick a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.

Open the Bid Leveler

The levelling runs in your browser. GeneralBid only sees a proposal or spec you choose to have read, and does not store it, or a sheet you choose to save as a share link.