CSI MasterFormat 04 00 00

Masonry scope checklist for bid levelling

By The GeneralBid team · Last reviewed

What should a masonry bid include?

Every masonry bid should price, include or explicitly exclude each of the 9 lines below, so the bids can be levelled like for like. Grout, reinforcing and flashing are frequently split between masonry and other trades.

The masonry scope lines

Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.

  1. 1CMU walls
  2. 2Brick veneer
  3. 3Grout and reinforcing
  4. 4Through-wall flashing and weeps
  5. 5Lintels, set only
  6. 6Control joints and sealant
  7. 7Scaffolding
  8. 8Mortar and cleaning
  9. 9Cold weather protection

Usual alternates

Compared side by side, never in the base total.

  • Stone accents

What do masonry bids leave out?

The gaps worth a written answer from every bidder before award.

  • Grout and reinforcing in CMU carried by neither the mason nor the concrete sub.
  • Through-wall flashing and weeps assumed to be by the waterproofing or roofing sub.
  • Scaffolding excluded, or priced for one lift less than the elevations need.
  • Lintels set but not furnished, with the steel left to miscellaneous metals.

Level it instead of reading it

Open this checklist in the Bid Leveler, type or paste each bid against it, and every gap is priced, every bid ranked like for like, and a clarification email written for each sub. Free, in your browser.

Open the masonry template

Masonry bid questions

What should a masonry bid include?

At least these 9 lines, each priced, included or excluded: cmu walls; brick veneer; grout and reinforcing; through-wall flashing and weeps; lintels, set only; control joints and sealant; scaffolding; mortar and cleaning; cold weather protection. Add the lines your spec section calls for.

What do masonry subcontractor bids most often leave out?

Grout and reinforcing in CMU carried by neither the mason nor the concrete sub. Through-wall flashing and weeps assumed to be by the waterproofing or roofing sub. Scaffolding excluded, or priced for one lift less than the elevations need. Lintels set but not furnished, with the steel left to miscellaneous metals.

What CSI division is masonry?

Masonry is CSI MasterFormat 04 00 00. Use the spec section in that division to add project-specific lines to this checklist.

How do you level masonry bids?

Put every masonry bid against the same 9 scope lines. For each line, record a price, included, excluded or not mentioned. Price every excluded or unmentioned line with a plug (your estimate, or the median of the other bids), then rank the bids on their levelled totals and send each sub a clarification for its gaps.

What are the usual masonry alternates?

Stone accents. Compare them side by side and keep them out of the base totals.

New to levelling? Read what bid leveling is and how to do it, or look up a term in the bid leveling glossary.

Drop in every proposal. Get one levelled sheet.

Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or start from your spec section, paste from Excel, or pick a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.

Open the Bid Leveler

The levelling runs in your browser. GeneralBid only sees a proposal or spec you choose to have read, and does not store it, or a sheet you choose to save as a share link.