CSI MasterFormat 05 12 00

Structural steel scope checklist for bid levelling

By The GeneralBid team · Last reviewed

What should a structural steel bid include?

Every structural steel bid should price, include or explicitly exclude each of the 10 lines below, so the bids can be levelled like for like. Shop drawings, connection design and the crane are where steel bids differ most.

The structural steel scope lines

Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.

  1. 1Structural steel, furnish
  2. 2Structural steel, erect
  3. 3Metal deck
  4. 4Shear studs
  5. 5Connection design and engineering
  6. 6Shop drawings
  7. 7Miscellaneous metals and lintels
  8. 8Stairs and railings
  9. 9Crane and hoisting
  10. 10Shop primer and touch-up

Usual alternates

Compared side by side, never in the base total.

  • Fireproofing

What do structural steel bids leave out?

The gaps worth a written answer from every bidder before award.

  • Connection design and engineering excluded, or assumed to be done by the engineer of record.
  • Crane and hoisting left to the GC, which can be the largest single difference between bids.
  • Miscellaneous metals, stairs and railings split out to a separate package without saying so.
  • Shop primer included but field touch-up and galvanising repair excluded.

Level it instead of reading it

Open this checklist in the Bid Leveler, type or paste each bid against it, and every gap is priced, every bid ranked like for like, and a clarification email written for each sub. Free, in your browser.

Open the structural steel template

Structural steel bid questions

What should a structural steel bid include?

At least these 10 lines, each priced, included or excluded: structural steel, furnish; structural steel, erect; metal deck; shear studs; connection design and engineering; shop drawings; miscellaneous metals and lintels; stairs and railings; crane and hoisting; shop primer and touch-up. Add the lines your spec section calls for.

What do structural steel subcontractor bids most often leave out?

Connection design and engineering excluded, or assumed to be done by the engineer of record. Crane and hoisting left to the GC, which can be the largest single difference between bids. Miscellaneous metals, stairs and railings split out to a separate package without saying so. Shop primer included but field touch-up and galvanising repair excluded.

What CSI division is structural steel?

Structural steel is CSI MasterFormat 05 12 00. Use the spec section in that division to add project-specific lines to this checklist.

How do you level structural steel bids?

Put every structural steel bid against the same 10 scope lines. For each line, record a price, included, excluded or not mentioned. Price every excluded or unmentioned line with a plug (your estimate, or the median of the other bids), then rank the bids on their levelled totals and send each sub a clarification for its gaps.

What are the usual structural steel alternates?

Fireproofing. Compare them side by side and keep them out of the base totals.

New to levelling? Read what bid leveling is and how to do it, or look up a term in the bid leveling glossary.

Drop in every proposal. Get one levelled sheet.

Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or start from your spec section, paste from Excel, or pick a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.

Open the Bid Leveler

The levelling runs in your browser. GeneralBid only sees a proposal or spec you choose to have read, and does not store it, or a sheet you choose to save as a share link.