CSI MasterFormat 07 10 00

Waterproofing and sealants scope checklist for bid levelling

By The GeneralBid team · Last reviewed

What should a waterproofing and sealants bid include?

Every waterproofing and sealants bid should price, include or explicitly exclude each of the 7 lines below, so the bids can be levelled like for like. Below-grade, air barrier and joint sealant scopes overlap with three or four other trades.

The waterproofing and sealants scope lines

Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.

  1. 1Below-grade waterproofing
  2. 2Air and vapour barrier
  3. 3Joint sealants, exterior
  4. 4Joint sealants, interior
  5. 5Firestopping
  6. 6Protection board
  7. 7Mock-up and testing

What do waterproofing and sealants bids leave out?

The gaps worth a written answer from every bidder before award.

  • Joint sealants split between waterproofing, glazing and painting, with interior joints carried by nobody.
  • Firestopping excluded and assumed to be by each MEP trade for its own penetrations.
  • Protection board and mock-ups left out of below-grade and air barrier bids.
  • Testing, such as flood tests and air barrier testing, assumed to be the owner's.

Level it instead of reading it

Open this checklist in the Bid Leveler, type or paste each bid against it, and every gap is priced, every bid ranked like for like, and a clarification email written for each sub. Free, in your browser.

Open the waterproofing and sealants template

Waterproofing and sealants bid questions

What should a waterproofing and sealants bid include?

At least these 7 lines, each priced, included or excluded: below-grade waterproofing; air and vapour barrier; joint sealants, exterior; joint sealants, interior; firestopping; protection board; mock-up and testing. Add the lines your spec section calls for.

What do waterproofing and sealants subcontractor bids most often leave out?

Joint sealants split between waterproofing, glazing and painting, with interior joints carried by nobody. Firestopping excluded and assumed to be by each MEP trade for its own penetrations. Protection board and mock-ups left out of below-grade and air barrier bids. Testing, such as flood tests and air barrier testing, assumed to be the owner's.

What CSI division is waterproofing and sealants?

Waterproofing and sealants is CSI MasterFormat 07 10 00. Use the spec section in that division to add project-specific lines to this checklist.

How do you level waterproofing and sealants bids?

Put every waterproofing and sealants bid against the same 7 scope lines. For each line, record a price, included, excluded or not mentioned. Price every excluded or unmentioned line with a plug (your estimate, or the median of the other bids), then rank the bids on their levelled totals and send each sub a clarification for its gaps.

New to levelling? Read what bid leveling is and how to do it, or look up a term in the bid leveling glossary.

Drop in every proposal. Get one levelled sheet.

Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or start from your spec section, paste from Excel, or pick a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.

Open the Bid Leveler

The levelling runs in your browser. GeneralBid only sees a proposal or spec you choose to have read, and does not store it, or a sheet you choose to save as a share link.