What should a glazing and storefront bid include?

Every glazing and storefront bid should price, include or explicitly exclude each of the 8 lines below, so the bids can be levelled like for like. Engineering, sealant and interior glass are the lines most often missing.

The glazing and storefront scope lines

Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.

  1. 1Aluminium storefront
  2. 2Curtain wall
  3. 3Entrance doors and hardware
  4. 4Interior glass and relites
  5. 5Mirrors
  6. 6Perimeter sealant
  7. 7Engineering and shop drawings
  8. 8Field testing

Usual alternates

Compared side by side, never in the base total.

  • Window film

What do glazing and storefront bids leave out?

The gaps worth a written answer from every bidder before award.

  • Engineering and shop drawings excluded from storefront and curtain wall bids.
  • Interior glass, relites and mirrors carried by the glazier on some bids and by nobody on others.
  • Perimeter sealant assumed to be the waterproofing sub's.
  • Field water testing excluded, or limited to one test.

Level it instead of reading it

Open this checklist in the Bid Leveler, type or paste each bid against it, and every gap is priced, every bid ranked like for like, and a clarification email written for each sub. Free, in your browser.

Open the glazing and storefront template

Glazing and storefront bid questions

What should a glazing and storefront bid include?

At least these 8 lines, each priced, included or excluded: aluminium storefront; curtain wall; entrance doors and hardware; interior glass and relites; mirrors; perimeter sealant; engineering and shop drawings; field testing. Add the lines your spec section calls for.

What do glazing and storefront subcontractor bids most often leave out?

Engineering and shop drawings excluded from storefront and curtain wall bids. Interior glass, relites and mirrors carried by the glazier on some bids and by nobody on others. Perimeter sealant assumed to be the waterproofing sub's. Field water testing excluded, or limited to one test.

What CSI division is glazing and storefront?

Glazing and storefront is CSI MasterFormat 08 40 00. Use the spec section in that division to add project-specific lines to this checklist.

How do you level glazing and storefront bids?

Put every glazing and storefront bid against the same 8 scope lines. For each line, record a price, included, excluded or not mentioned. Price every excluded or unmentioned line with a plug (your estimate, or the median of the other bids), then rank the bids on their levelled totals and send each sub a clarification for its gaps.

What are the usual glazing and storefront alternates?

Window film. Compare them side by side and keep them out of the base totals.

New to levelling? Read what bid leveling is and how to do it, or look up a term in the bid leveling glossary.

Drop in every proposal. Get one levelled sheet.

Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or start from your spec section, paste from Excel, or pick a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.

Open the Bid Leveler

The levelling runs in your browser. GeneralBid only sees a proposal or spec you choose to have read, and does not store it, or a sheet you choose to save as a share link.