Skip to content

CSI MasterFormat 07 50 00

Roofing scope checklist for bid levelling

By The GeneralBid team · Last reviewed

What should a roofing bid include?

Every roofing bid should price, include or explicitly exclude each of the 9 lines below, so the bids can be levelled like for like. Flashing, curbs and the manufacturer warranty vary more than the membrane price.

The roofing scope lines

Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.

  1. 1Roof membrane system
  2. 2Insulation and cover board
  3. 3Sheet metal flashing and coping
  4. 4Roof curbs and penetrations
  5. 5Roof drains and overflow, set only
  6. 6Walkway pads
  7. 7Manufacturer's warranty
  8. 8Hoisting
  9. 9Temporary roofing

Usual alternates

Compared side by side, never in the base total.

  • 20-year warranty upgrade

What do roofing bids leave out?

The gaps worth a written answer from every bidder before award.

  • Sheet metal flashing and coping excluded from membrane bids and carried as a separate trade.
  • Curbs and penetrations flashed only for the units on the drawings, not those added by MEP.
  • Warranty length and type differing between bids that otherwise look identical.
  • Hoisting and temporary roofing assumed to be by the GC.

Level it instead of reading it

Open this checklist in the Bid Leveler, type or paste each bid against it, and every gap is priced, every bid ranked like for like, and a clarification email written for each sub. Free, in your browser.

Open the roofing template

Roofing bid questions

What should a roofing bid include?

At least these 9 lines, each priced, included or excluded: roof membrane system; insulation and cover board; sheet metal flashing and coping; roof curbs and penetrations; roof drains and overflow, set only; walkway pads; manufacturer's warranty; hoisting; temporary roofing. Add the lines your spec section calls for.

What do roofing subcontractor bids most often leave out?

Sheet metal flashing and coping excluded from membrane bids and carried as a separate trade. Curbs and penetrations flashed only for the units on the drawings, not those added by MEP. Warranty length and type differing between bids that otherwise look identical. Hoisting and temporary roofing assumed to be by the GC.

What CSI division is roofing?

Roofing is CSI MasterFormat 07 50 00. Use the spec section in that division to add project-specific lines to this checklist.

How do you level roofing bids?

Put every roofing bid against the same 9 scope lines. For each line, record a price, included, excluded or not mentioned. Price every excluded or unmentioned line with a plug (your estimate, or the median of the other bids), then rank the bids on their levelled totals and send each sub a clarification for its gaps.

What are the usual roofing alternates?

20-year warranty upgrade. Compare them side by side and keep them out of the base totals.

New to levelling? Read what bid leveling is and how to do it, or look up a term in the bid leveling glossary.

Drop in every proposal. Get one levelled sheet.

Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or start from your spec section, paste from Excel, or pick a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.

Open the Bid Leveler

The levelling runs in your browser. GeneralBid only sees a proposal or spec you choose to have read, and does not store it, or a sheet you choose to save as a share link.