Skip to content

CSI MasterFormat 21 00 00

Fire protection scope checklist for bid levelling

By The GeneralBid team · Last reviewed

What should a fire protection bid include?

Every fire protection bid should price, include or explicitly exclude each of the 9 lines below, so the bids can be levelled like for like. Fire pump, backflow and design responsibility change the number more than the heads do.

The fire protection scope lines

Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.

  1. 1Sprinkler mains and branch lines
  2. 2Heads and trim
  3. 3Design and hydraulic calcs
  4. 4Permits and fees
  5. 5Standpipes
  6. 6Fire pump
  7. 7Backflow preventer
  8. 8Fire department connection
  9. 9Testing and certification

What do fire protection bids leave out?

The gaps worth a written answer from every bidder before award.

  • Design and hydraulic calculations excluded, or based on a flow test nobody has ordered.
  • Fire pump and backflow preventer split between fire protection and plumbing.
  • Permits and fees excluded and left to the GC.
  • Fire department connection and standpipes priced by one bidder and not the others.

Level it instead of reading it

Open this checklist in the Bid Leveler, type or paste each bid against it, and every gap is priced, every bid ranked like for like, and a clarification email written for each sub. Free, in your browser.

Open the fire protection template

Fire protection bid questions

What should a fire protection bid include?

At least these 9 lines, each priced, included or excluded: sprinkler mains and branch lines; heads and trim; design and hydraulic calcs; permits and fees; standpipes; fire pump; backflow preventer; fire department connection; testing and certification. Add the lines your spec section calls for.

What do fire protection subcontractor bids most often leave out?

Design and hydraulic calculations excluded, or based on a flow test nobody has ordered. Fire pump and backflow preventer split between fire protection and plumbing. Permits and fees excluded and left to the GC. Fire department connection and standpipes priced by one bidder and not the others.

What CSI division is fire protection?

Fire protection is CSI MasterFormat 21 00 00. Use the spec section in that division to add project-specific lines to this checklist.

How do you level fire protection bids?

Put every fire protection bid against the same 9 scope lines. For each line, record a price, included, excluded or not mentioned. Price every excluded or unmentioned line with a plug (your estimate, or the median of the other bids), then rank the bids on their levelled totals and send each sub a clarification for its gaps.

New to levelling? Read what bid leveling is and how to do it, or look up a term in the bid leveling glossary.

Drop in every proposal. Get one levelled sheet.

Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or start from your spec section, paste from Excel, or pick a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.

Open the Bid Leveler

The levelling runs in your browser. GeneralBid only sees a proposal or spec you choose to have read, and does not store it, or a sheet you choose to save as a share link.