Skip to content

CSI MasterFormat 22 00 00

Plumbing scope checklist for bid levelling

Site utilities, fixtures supply and gas piping are often carried by nobody or by two trades.

The scope lines

Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.

  1. 1Underground sanitary and storm
  2. 2Domestic water piping
  3. 3Fixtures, furnish
  4. 4Fixtures, install
  5. 5Water heaters
  6. 6Gas piping
  7. 7Roof drains and piping
  8. 8Site utilities to 5 ft outside building
  9. 9Pipe insulation
  10. 10Permits and fees
  11. 11Cutting, coring and patching
  12. 12Testing and sterilisation

Where plumbing bids differ

The gaps worth a written answer from every bidder before award.

  • Site utilities beyond five feet of the building carried by neither plumbing nor sitework.
  • Fixtures priced install-only on some bids and furnish-and-install on others.
  • Gas piping excluded, or limited to the building and not the meter.
  • Cutting, coring and patching assumed to be by the GC.

Level it instead of reading it

Open this checklist in the Bid Leveler, type or paste each bid against it, and every gap is priced, every bid ranked like for like, and a clarification email written for each sub. Free, in your browser.

Open the plumbing template

Drop in every proposal. Get one levelled sheet.

Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or paste from Excel, or start from a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.

Open the Bid Leveler

The levelling runs in your browser. GeneralBid only sees a proposal you choose to have read, and does not store it, or a sheet you choose to save as a share link.