CSI MasterFormat 22 00 00

Plumbing scope checklist for bid levelling

By The GeneralBid team · Last reviewed

What should a plumbing bid include?

Every plumbing bid should price, include or explicitly exclude each of the 12 lines below, so the bids can be levelled like for like. Site utilities, fixtures supply and gas piping are often carried by nobody or by two trades.

The plumbing scope lines

Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.

  1. 1Underground sanitary and storm
  2. 2Domestic water piping
  3. 3Fixtures, furnish
  4. 4Fixtures, install
  5. 5Water heaters
  6. 6Gas piping
  7. 7Roof drains and piping
  8. 8Site utilities to 5 ft outside building
  9. 9Pipe insulation
  10. 10Permits and fees
  11. 11Cutting, coring and patching
  12. 12Testing and sterilisation

What do plumbing bids leave out?

The gaps worth a written answer from every bidder before award.

  • Site utilities beyond five feet of the building carried by neither plumbing nor sitework.
  • Fixtures priced install-only on some bids and furnish-and-install on others.
  • Gas piping excluded, or limited to the building and not the meter.
  • Cutting, coring and patching assumed to be by the GC.

Level it instead of reading it

Open this checklist in the Bid Leveler, type or paste each bid against it, and every gap is priced, every bid ranked like for like, and a clarification email written for each sub. Free, in your browser.

Open the plumbing template

Plumbing bid questions

What should a plumbing bid include?

At least these 12 lines, each priced, included or excluded: underground sanitary and storm; domestic water piping; fixtures, furnish; fixtures, install; water heaters; gas piping; roof drains and piping; site utilities to 5 ft outside building; pipe insulation; permits and fees; cutting, coring and patching; testing and sterilisation. Add the lines your spec section calls for.

What do plumbing subcontractor bids most often leave out?

Site utilities beyond five feet of the building carried by neither plumbing nor sitework. Fixtures priced install-only on some bids and furnish-and-install on others. Gas piping excluded, or limited to the building and not the meter. Cutting, coring and patching assumed to be by the GC.

What CSI division is plumbing?

Plumbing is CSI MasterFormat 22 00 00. Use the spec section in that division to add project-specific lines to this checklist.

How do you level plumbing bids?

Put every plumbing bid against the same 12 scope lines. For each line, record a price, included, excluded or not mentioned. Price every excluded or unmentioned line with a plug (your estimate, or the median of the other bids), then rank the bids on their levelled totals and send each sub a clarification for its gaps.

New to levelling? Read what bid leveling is and how to do it, or look up a term in the bid leveling glossary.

Drop in every proposal. Get one levelled sheet.

Drop in the sub proposals as PDFs or pasted email text and review each one line by line before it goes in, or start from your spec section, paste from Excel, or pick a trade template. See every exclusion priced, the real low bid, and a clarification email for each sub. Free. No account, no card, no call.

Open the Bid Leveler

The levelling runs in your browser. GeneralBid only sees a proposal or spec you choose to have read, and does not store it, or a sheet you choose to save as a share link.