CSI MasterFormat 06 10 00
Rough carpentry scope checklist for bid levelling
By The GeneralBid team · Last reviewed
What should a rough carpentry bid include?
Every rough carpentry bid should price, include or explicitly exclude each of the 8 lines below, so the bids can be levelled like for like. Blocking for other trades is the classic gap: everyone assumes carpentry carries it.
The rough carpentry scope lines
Ask every bidder to say, for each line, whether it is priced, included, or excluded. A line a bid never mentions is the one that turns into a change order.
- 1Wood framing
- 2Sheathing
- 3Blocking for other trades
- 4Roof trusses, furnish and set
- 5Hardware and hold-downs
- 6Temporary protection and barricades
- 7Fire-treated lumber where required
- 8Engineered lumber
What do rough carpentry bids leave out?
The gaps worth a written answer from every bidder before award.
- Blocking for other trades: casework, grab bars, TVs and equipment, assumed to be someone else's.
- Fire-treated lumber priced as standard where the code or the drawings call for it.
- Hold-downs and hardware supplied by the truss or lumber supplier and installed by nobody.
- Temporary protection and barricades left to the GC's general conditions.
Level it instead of reading it
Open this checklist in the Bid Leveler, type or paste each bid against it, and every gap is priced, every bid ranked like for like, and a clarification email written for each sub. Free, in your browser.
Open the rough carpentry templateRough carpentry bid questions
What should a rough carpentry bid include?
At least these 8 lines, each priced, included or excluded: wood framing; sheathing; blocking for other trades; roof trusses, furnish and set; hardware and hold-downs; temporary protection and barricades; fire-treated lumber where required; engineered lumber. Add the lines your spec section calls for.
What do rough carpentry subcontractor bids most often leave out?
Blocking for other trades: casework, grab bars, TVs and equipment, assumed to be someone else's. Fire-treated lumber priced as standard where the code or the drawings call for it. Hold-downs and hardware supplied by the truss or lumber supplier and installed by nobody. Temporary protection and barricades left to the GC's general conditions.
What CSI division is rough carpentry?
Rough carpentry is CSI MasterFormat 06 10 00. Use the spec section in that division to add project-specific lines to this checklist.
How do you level rough carpentry bids?
Put every rough carpentry bid against the same 8 scope lines. For each line, record a price, included, excluded or not mentioned. Price every excluded or unmentioned line with a plug (your estimate, or the median of the other bids), then rank the bids on their levelled totals and send each sub a clarification for its gaps.
New to levelling? Read what bid leveling is and how to do it, or look up a term in the bid leveling glossary.